F-721B-R

A forum in which to discuss topics specific to the assembly of the RV 7/7A.
Post Reply
Harveyseven
Class G
Posts: 5
Joined: Mon Apr 07, 2008 7:21 am
Location: Shrewsbury UK

F-721B-R

Post by Harveyseven »

Hi,

I’m at the longeron stage and noticed that on a tip up, there is a modification to the F-721B right side (top deck that attaches to the longeron and the canopy closes onto it). The drawing doesn’t specify if it’s just the right side that is modified or both.
I’m going blind trying to see a reference on the drawings, any ideas?
Member of a group with an RV9A. Building my own Slow build RV7 tip-up.
Fuselage complete with tail & wigs fitted. Just started the wiring.

User avatar
bruceh
Class D
Posts: 396
Joined: Sun Apr 06, 2008 11:11 pm
Location: Ramona, CA
Contact:

Re: F-721B-R

Post by bruceh »

Yes, you need to do both right and left side trims as shown on DWG 18.
Bruce Hill
RV-9A N5771H flying over 1100 hours!
Build Log at http://www.overthehills.com/RV-9A-Project
Blog at https://flyingoverthehills.wordpress.com/
EAA Tech Counselor, A&P

Harveyseven
Class G
Posts: 5
Joined: Mon Apr 07, 2008 7:21 am
Location: Shrewsbury UK

Re: F-721B-R

Post by Harveyseven »

Great, thanks, I’ll go check the drawing now.
Member of a group with an RV9A. Building my own Slow build RV7 tip-up.
Fuselage complete with tail & wigs fitted. Just started the wiring.

Post Reply